Projects to doThis is a featured page

6/21/11
Finish Staining Wall
Cut down wires in TB area
Make a nice summer camp picture board for marketing purposes. (Talk to Brett about first)

New syringes for Epi will arrive next week. Put box in First Aid Cabinet and replace all syringes in first aid kits.
Re-stock first aid cabinet. Make list and amount of what needs to be ordered. Brett can order on Amazon.
Y Whitewater Kayak needs bolts for the foot pegs. Need an easy to adjust wingnut (can do by hand), get from Cole's Hardware

Weedwhack TB Area
Weedwhack Big High Ropes Course
Remove root wad at end of Birdcage Element
Hang canoe in ceiling directly above where it is now.
Contact Pocono Whitewater to repair all the rafts that need it down there.
Take rafts to Pocono Whitewater
Clear out under raft decks to make place for paddleboards
Check all backbands and bulkheads in whitewater kayaks, fix as needed.
Inflate all float bags. Repair those that can be repaired. Bleach all hoses to clean. Get at least one in each WW kayak.
Wash wetsuitts, splashtops and PFD's
Continue rope taping project
Continue High Ropes Project to mark pullies. Take a picture of all the setups so that a master document can be made.
Set up TeePee
Stencil Quest on Stand up Paddle Boards.
Order new waterproof Color Quest logo stickers
Fall Schedule to Printer.


9/21/09
Office
  • Sent email to all 2009 FLEs to sign up for ALL events they will or will not be attending
  • Update new BU emails on mass email list ( Ask susan about this) use directory or staff contact to find emails
  • fix staff contact list, there should be only one table, copy contacts from the second table into the bottom of the first table


Patch raft that is not inflating (ask tab which one)

    Patch Duckie
    Stove/Pot setup -
    Dishwashing print outs (with Ben)



    bsimpson
    bsimpson
    Latest page update: made by bsimpson , Jun 23 2011, 1:57 PM EDT (about this update About This Update bsimpson Edited by bsimpson

    118 words added

    view changes

    - complete history)
    Keyword tags: None
    More Info: links to this page
    Started By Thread Subject Replies Last Post
    amw23583 Updates #2 0 Jul 21 2011, 8:18 PM EDT by amw23583
    Thread started: Jul 21 2011, 8:18 PM EDT  Watch
    Almost all pfd's have been soaked, scrubbed and washed. For now on we really need to do a better job at hosing all the water gear to remove all soiled materials before hanging.

    Do you find this valuable?    
    Keyword tags: None
    amw23583 Updates 0 Jul 16 2011, 10:40 PM EDT by amw23583
    Thread started: Jul 16 2011, 10:40 PM EDT  Watch
    The first aid kits/cabinet were restocked and a list was emailed to Brett of needed supplies last week.
    Amy & Eli also set up the teepee but the inner lining still needs put up.

    **If anyone knows where the Quest stencil is please let me know.

    Thanks!
    Do you find this valuable?    
    Keyword tags: None
    Showing 2 of 2 threads for this page